Keisei Narita Airport Line Sky

- 22.42

Best Price on Hotel Sky Court NARITA in Tokyo + Reviews
photo src: www.agoda.com

The Keisei Narita Airport Line (???????, Keisei-Narita-K?k?-sen) is a Japanese railway line connecting Keisei-Takasago Station and Narita Airport Terminal 1 Station. The entire route from Keisei Ueno Station, including the Keisei Main Line as far as Keisei-Takasago, is branded Narita Sky Access (?????????, Narita-sukai-akusesu).

The Keisei Electric Railway operates over the entire line, while other companies operate over certain sections of it, such as Hokuso Railway. The new line is used by Skyliner services operating at up to 160 km/h using new Keisei AE series EMUs.

Narita International Airport Corporation owns a 63.74% majority stake in Shibayama Railway as of July 2009.


photo src: www.hotel.info


Maps, Directions, and Place Reviews



Operations

Trains utilize the Keisei Electric Railway's Main Line between Keisei Ueno and Keisei-Takasago. Trains run at a maximum speed of 160 km/h, thus completing the run from Nippori to Narita Airport Terminal 2·3 in a minimum of 36 minutes, 15 minutes faster than the previous Skyliner route, which took 51 minutes. The reserved-seat Keisei Skyliner fare for the route between Narita airport and either Nippori or Ueno stations is ¥2,400 and takes 36-41 min., but the Access Express commuter fast train costs ¥1,200 and takes about 78 min. Express trains also operate to Haneda Airport from Narita Airport via Keisei-Takasago and Aoto then via the Keisei Oshiage Line to Oshiage, and on the Toei Asakusa Line via Shimbashi to Sengakuji, the Keikyu Main Line and via Shinagawa to the Keikyu Airport Line. This makes it possible to connect the two airports in a minimum of around 65 minutes, compared to the previous minimum of 106 minutes. Many Express trains separate (or connect) at Aoto station and continue to the Keikyu Haneda International Airport station (¥1,630, about 76 min.) or one can transfer at Shinagawa (on the way to Haneda) to stay on the Keikyu Main Line for Yokohama (¥1,630, about 101 min.).

There are also plans to build a spur from the Toei Asakusa Line to T?ky? Station, opening a (potentially) faster route to the airport via the Keisei Oshiage Line.


Hotel Sky Court Narita Video



Basic data

  • Total length: 51.4 km (31.9 mi)
  • Service operators and track owners:

photo src: www.hotel.info


Station list

Trains stop at stations marked "?" and pass those marked "|".


Best Price on Sky Court Koiwa Hotel in Tokyo + Reviews!
photo src: www.agoda.com


History

Service on this line commenced on July 17, 2010. The line involved the refurbishment of 32.3 km of existing track on the Hokus? Line, as well as the construction of 19.1 km of new dual track to Narita Airport, partly using disused rights-of-way originally planned for the cancelled Narita Shinkansen project. The total cost, according to the Narita Rapid Rail Access website, was estimated to be ¥126 billion, or about US$1.3 billion.

Source of the article : Wikipedia



EmoticonEmoticon

 

Start typing and press Enter to search